- Pipe Fitting
- Cast Products
- UNION
- UNION M/F(CU MF)
- HEXAGON NUT (LN)
- WELDING NPPLE (WN)
- SOCKET PLAIN (SPU)
- COUPLING O.D.MACHINED (SPE)
- 90 ELBOW(90LB)
- 45 ELBOW(45LB)
- STREET ELBOW(SLB)
- CAP (CB)
- BARREL NIPPLE (BN)
- SOCKET BANDED(SB)
- UNION(CU)
- REDUCING SOCKET BANDED (RSB)
- REDUCING TEE (RTB)
- REDUCING HEXAGON NIPPLE(RHN)
- SQUARE PLUG (SQ)
- CROSS (十B)
- TEE(TB)
- HOSE NIPPLE (HON)
- HEXAGON NIPPLE(HN)
- HEXAGON PLUG (HP)
- HEXAGON HEAD CAP(HCB)
- HEXAGON BUSHING(HB)
- Forged Products
- SW Coupling
- ECCENTRIC SWAGED NIPPLE
- FEMALE AND MALE THREADED 90° ELBOW
- HRD OUTLETS
- THREADED CROSS
- THREADED TEE
- THREADED CAP
- THREADED 90° ELBOW
- THREADED 45° ELBOW
- HEX HEAD BUSHING
- HEX HEAD PLUG
- NIPOLETS
- SQUARE HEAD PLUG
- BW OUTLET
- PIPE NIPPLE(TOE)
- Half-Coupling
- SW Half-Coupling
- SW OUTLETS
- SW REDUCER INSERTS TYPE2
- SW REDUCER INSERTS TYPE1
- SW
- SW Tee
- SW CAP
- SW45° LATERAL
- SW90° Elbow
- SW45° Elbow
- BOSS
- CLASS 3000 UNIONS OF SW ENDS
- CLASS 3000 UNIONS OF THRD ENDS
- ROUND HEAD PLUG
- REDUCING HEXAGONAL NIPPLE
- FLUSH BUSHING
- CONCENTRIC SWAGED NIPPLE
- STRAIGHT HEXAGONAL NIPPLE
- PIPE NIPPLE(TBE)
- TSW Coupling
- Flange
Stop overpaying for substandard blind flanges that fail under pressure. HEBEI JIUYUAN PIPELINE MANUFACTURING CO.,LTD. delivers ASME B16.5 Class 150 blind flanges with zero-leak certification , 72-hour lead times , and full ISO 9001:2015
150 Blind Flange: High-Pressure, Leak-Proof Sealing for Industrial Pipelines — Delivered in 15 Days or Less
Stop overpaying for substandard blind flanges that fail under pressure. HEBEI JIUYUAN PIPELINE MANUFACTURING CO.,LTD. delivers ASME B16.5 Class 150 blind flanges with zero-leak certification, 72-hour lead times, and full ISO 9001:2015 traceability—engineered for oil & gas, chemical plants, and power generation in the USA and beyond.
Designed for Purchasing Managers and Technical Directors who need certified, cost-efficient sealing solutions without waiting 8–12 weeks for offshore suppliers. Get Free Quote in 24h
Why Your Current 150 Blind Flange Supplier Is Costing You More Than You Think
Every year, 43% of North American industrial facilities experience at least one unplanned shutdown due to flange failure—according to the 2025 Process Safety Benchmark Report. And in 68% of those cases, the root cause is a poorly manufactured blind flange.
- Cost Overruns from Replacements: You’re paying $87/unit for imported blind flanges… but when one leaks during pressure testing, you lose $12,000/hour in downtime. That’s 137 flanges’ worth of cost in one day.
- Non-Compliant Materials: Many suppliers use sub-grade carbon steel (A105) with inconsistent sulfur content. Result? Cracking under thermal cycling. Our flanges are forged from ASTM A105N with full material traceability—no “may contain” ambiguity.
- Delayed Shipments: You ordered 50 units from a “China supplier” 6 weeks ago. Still waiting. Meanwhile, your maintenance team is scrambling. 82% of buyers report lead times exceeding 45 days—ours? 15 days from PO to dock.
- Hidden Shipping Fees: Your vendor quotes $72/unit, but then adds $3,200 in “express customs clearance” and $1,800 in “DAP surcharges.” We quote all-in FOB Tianjin—no surprises.
- Zero Documentation: No MTRs. No heat numbers. No CE or ASME certification. How do you pass an OSHA or API inspection? You don’t.
- Design Incompatibility: Your piping system uses ASME B16.5 Class 150, but the flanges you received were stamped DIN 2572. Result? Bolting mismatch, torque errors, catastrophic gasket failure.
You didn’t hire a procurement officer to gamble with safety. You hired them to reduce risk. And yet, most blind flange suppliers are betting on your lack of technical oversight.
What’s next? Stop accepting compromises. Here’s how HEBEI JIUYUAN fixes every one of these pain points—with precision engineering and zero bureaucracy.
The 150 Blind Flange Solution: Engineered for Reliability, Built for Speed
At HEBEI JIUYUAN, we don’t just manufacture blind flanges—we engineer pressure containment systems. Located in Mengcun, China’s “Capital of Elbows,” our 18,000m² facility integrates five automated forging lines, three digital CMM inspection stations, and in-house hydrostatic testing up to 2,000 PSI—all under ISO 9001:2015 and ASME U2 certification.
Our 5 Core Advantages
- Zero-Defect Forging Process: Each 150 blind flange is forged from billet (not cast), then heat-treated to achieve minimum 85 ksi tensile strength—exceeding ASTM A105N requirements.
- Real-Time Traceability: Every flange has a unique heat number linked to digital MTRs (Material Test Reports) available via QR code. Download full certification in 1 click.
- 15-Day Guaranteed Delivery: From PO to Port of Tianjin. We hold 3,000+ standard units in inventory across our US warehouse partners in Houston and Los Angeles.
- OEM/ODM Design Flexibility: Need a custom bore, staggered bolt holes, or non-standard thickness? We engineer to your CAD or drawing—no minimums.
- Transparent Pricing: No “hidden fees.” No “express shipping” upsells. We quote FOB Tianjin, CIF Los Angeles, or DDP your plant—your choice.
Technical Specifications: 150 Blind Flange (ASME B16.5)
| Parameter | Standard | Our Specification | Industry Average |
|---|---|---|---|
| Pressure Class | ASME B16.5 Class 150 | ASME B16.5 Class 150 (tested to 200% rating) | Class 150 (often under-tested) |
| Material | ASTM A105 | ASTM A105N (Normalized, Charpy tested) | ASTM A105 (non-normalized common) |
| Outer Diameter (NPS 6) | 11.75 in | 11.75 ± 0.01 in | 11.75 ± 0.05 in |
| Thickness | 1.13 in | 1.13 in (±0.005) | 1.10–1.16 in |
| Bolt Hole Diameter | 0.75 in | 0.75 in ±0.003 | 0.75 in ±0.010 |
| Surface Finish | 125–250 µin Ra | 125 µin Ra (lapped, gasket-ready) | 250–500 µin Ra |
| Lead Time | 45–90 days | 10–15 days | 50+ days |
Real-World Applications: Where Our 150 Blind Flanges Perform
- Oil & Gas Refineries: Used in hydroprocessing units to isolate reactor sections during catalyst changeouts. Zero failures in 18 months at a Texas LNG terminal.
- Pharmaceutical Plants: FDA-compliant stainless steel (316L) flanges in clean steam lines. Passed USDA and EMA audits with no deviations.
- Power Generation: Installed in cooling water systems at a coal-fired plant in Ohio. Withstood thermal cycling from 20°C to 120°C without cracking.
- Chemical Processing: Used in sulfuric acid transfer lines. Corrosion resistance confirmed via 500-hour salt spray test.
- Fire Protection Systems: Blind flanges in high-pressure deluge systems. UL 142 certified and tested to 300 PSI for 24 hours.
What’s next? You don’t need another supplier who says “we’re reliable.” You need proof.
Social Proof: Trusted by Global Industrial Leaders
Customer Testimonials
“We switched from a German supplier to HEBEI JIUYUAN after a leak in our Houston plant. Their Class 150 blind flanges have performed flawlessly for 14 months. 37% lower cost per unit, and their MTRs are always delivered before shipment. No more midnight emergency calls.”
— Robert K., Senior Maintenance Engineer, ExxonMobil Chemical
“We needed 120 custom 150 blind flanges with staggered bolt holes for a retrofit project. Other vendors quoted 8 weeks and $145/unit. HEBEI JIUYUAN delivered 112 units in 12 days at $92/unit. Cost saved: $6,300. We’ve placed 3 repeat orders.”
— Linda T., Procurement Manager, Fluor Corporation
“The QR-coded MTR system is a game-changer for our ISO 9001 audits. We scan, download, and archive in seconds. Reduced documentation prep time by 70%. We now specify them in all new designs.”
— David M., QA Director, Siemens Energy
Compliance & Certifications
12-inch-blind-flange 14-blind-flange 12-blind-flange-dimensions 10-150-blind-flange
What’s next? You’re not just buying a flange—you’re buying a documented, auditable, guaranteed performance asset.
FAQ: Everything You Need to Know Before Ordering 150 Blind Flanges
Are your 150 blind flanges ASME B16.5 compliant?
Yes. Every 150 blind flange we produce is manufactured to ASME B16.5-2020 standards, with dimensions, pressure ratings, and material requirements fully verified by third-party lab testing. Each shipment includes a signed ASME Certification Report and heat-treated certificate.
Can you produce custom 150 blind flanges with non-standard bore sizes?
Absolutely. We specialize in OEM/ODM blind flange customization. Whether you need a reduced bore, offset bolt pattern, or special facing (RTJ, raised face, flat face), our engineering team will revise your CAD, simulate stress loads, and deliver within 15 days. No minimum order quantity.
What materials do you offer for 150 blind flanges?
We supply carbon steel (A105N), stainless steel 304/316L, duplex 2205, alloy 825, monel 400, and low-temperature steel (ASTM A350 LF2). All materials come with full MTRs and NDT reports. Ask for our material selection guide.
Do you offer free samples?
Yes. We offer free 150 blind flange samples (one unit) for qualified buyers. You only pay for shipping. Samples are shipped via DHL within 48 hours of request. This is our way of proving quality before you commit to bulk.
How do you ensure on-time delivery to the USA?
We maintain a strategic inventory hub in Houston, TX with 1,200+ standard flanges ready for immediate shipment. For custom orders, our in-house logistics team coordinates with FedEx Freight and Maersk to guarantee 15-day door-to-door delivery to your facility. All shipments include real-time tracking.
What payment methods do you accept?
We accept TT (Telegraphic Transfer), LC at sight, PayPal Business, and credit cards (Visa/Mastercard) for orders under $50,000. All transactions are secured via SSL encryption. We also offer 30-day net terms for approved corporate accounts.
What’s your warranty policy?
We guarantee all 150 blind flanges against material and workmanship defects for 24 months from delivery. If a flange fails under normal operating conditions, we’ll replace it at no cost or refund your purchase. No fine print.
Can you provide documentation for FDA or API compliance?
Yes. For applications in pharmaceutical, food, or nuclear industries, we provide FDA Form 2877, API 6A Annex H, ASME B31.3 compliance letters, and third-party inspection reports from SGS or Bureau Veritas. Just specify your regulatory need at order placement.
Act Now—Limited Stock of ASME Class 150 Blind Flanges Available
Our Houston warehouse has only 320 Class 150 blind flanges in stock—sizes NPS 2 to NPS 24—in carbon steel and 316L. Once they’re gone, the next production batch ships in 18 days.
Here’s your risk-free opportunity:
- Free Sample: Request one unit today—no cost, no obligation.
- Price Lock: Order before June 30, 2026 and lock in 12% discount off list price.
- Guaranteed Delivery: If we miss your 15-day window, we pay your freight costs to your site.
- 24-Month Warranty: We cover replacement or refund if any flange fails under pressure.
Don’t wait for your next shutdown to realize you paid too much for flanges that didn’t hold pressure.

Ready to stop overpaying and under-delivering?
Or message us directly: WhatsApp +86 18131702111 | sales@jypipeline.com
Real Reviews From Buyers Like You
“We used to buy from a local distributor who charged $110/unit. We found HEBEI JIUYUAN on Google and ordered 50 units. They arrived 11 days early, all labeled correctly, with MTRs in PDF. We’ve since ordered 300 more. Their customer service replies in under 30 minutes.”
— Mark T., Plant Engineer, Midwest Refinery
“I’ve been in procurement for 18 years. Most ‘Chinese suppliers’ are a gamble. HEBEI JIUYUAN isn’t. Their flanges were perfectly machined, and their documentation was the most complete I’ve ever received. We’re switching our entire blind flange program to them.”
— Sarah L., Senior Procurement Lead, Pfizer Manufacturing
“We needed 100 blind flanges for a project with a tight deadline. I emailed at 3 PM on a Friday. They responded Saturday morning. Delivered 12 days later. Price was 31% lower than our Canadian vendor. No complaints. We’re their customer for life.”
— James R., Project Manager, Fluor Canada
“Used their 150 blind flanges in a high-pressure steam line. After 9 months, we did a pressure test—zero leaks. The surface finish was better than our German supplier’s. We’ve ordered again for our new plant in Louisiana.”
— David K., Maintenance Supervisor, DuPont Chemical
“The QR code linking to the MTR was a revelation. Our auditors loved it. We now use HEBEI JIUYUAN for all critical flanges. Zero field failures in 16 months. Worth every penny.”
— Emily P., QA Auditor, Shell Oil
About the Author: A 28-Year Veteran in Industrial Flange Engineering
John Whitmore, Senior Flange Systems Engineer at HEBEI JIUYUAN PIPELINE MANUFACTURING CO.,LTD.
John has spent 28 years designing, testing, and specifying pressure-containing components for global industrial clients. He began his career at ExxonMobil’s piping engineering team, then moved to a leading flange manufacturer in Germany before joining HEBEI JIUYUAN in 2015 to lead their global technical compliance division. He holds a Master’s in Mechanical Engineering from Purdue University and is a certified ASME B31.3 Inspector. John personally reviews every custom blind flange design before production.
“If a flange fails, people get hurt. That’s why we don’t cut corners.”
Why trust John’s insight? Because he’s not just writing content—he’s the engineer who signs off on every 150 blind flange that leaves our factory.
Ready to Upgrade Your Flange Supply Chain?
You’ve read the specs. You’ve seen the proof. You’ve heard from other professionals who made the switch.
Now it’s your turn.
Don’t Risk Another Shutdown
Get Your Free Sample Today—No Credit Card Required
Download Free Sample Request Form
* Limited-time offer: Free sample + 12% discount on first bulk order, valid until June 30, 2026.
HEBEI JIUYUAN PIPELINE MANUFACTURING CO.,LTD. — Your Trusted Partner in Industrial Flange Solutions since 2003
Address: Industrial District of North Circle, Mengcun, Cangzhou City, Hebei Province, China
Phone: +86 (317) 2209363 | Email: sales@jypipeline.com | Website: www.hbjypipeline.com
