- Pipe Fitting
- Cast Products
- UNION
- UNION M/F(CU MF)
- HEXAGON NUT (LN)
- WELDING NPPLE (WN)
- SOCKET PLAIN (SPU)
- COUPLING O.D.MACHINED (SPE)
- 90 ELBOW(90LB)
- 45 ELBOW(45LB)
- STREET ELBOW(SLB)
- CAP (CB)
- BARREL NIPPLE (BN)
- SOCKET BANDED(SB)
- UNION(CU)
- REDUCING SOCKET BANDED (RSB)
- REDUCING TEE (RTB)
- REDUCING HEXAGON NIPPLE(RHN)
- SQUARE PLUG (SQ)
- CROSS (十B)
- TEE(TB)
- HOSE NIPPLE (HON)
- HEXAGON NIPPLE(HN)
- HEXAGON PLUG (HP)
- HEXAGON HEAD CAP(HCB)
- HEXAGON BUSHING(HB)
- Forged Products
- SW Coupling
- ECCENTRIC SWAGED NIPPLE
- FEMALE AND MALE THREADED 90° ELBOW
- HRD OUTLETS
- THREADED CROSS
- THREADED TEE
- THREADED CAP
- THREADED 90° ELBOW
- THREADED 45° ELBOW
- HEX HEAD BUSHING
- HEX HEAD PLUG
- NIPOLETS
- SQUARE HEAD PLUG
- BW OUTLET
- PIPE NIPPLE(TOE)
- Half-Coupling
- SW Half-Coupling
- SW OUTLETS
- SW REDUCER INSERTS TYPE2
- SW REDUCER INSERTS TYPE1
- SW
- SW Tee
- SW CAP
- SW45° LATERAL
- SW90° Elbow
- SW45° Elbow
- BOSS
- CLASS 3000 UNIONS OF SW ENDS
- CLASS 3000 UNIONS OF THRD ENDS
- ROUND HEAD PLUG
- REDUCING HEXAGONAL NIPPLE
- FLUSH BUSHING
- CONCENTRIC SWAGED NIPPLE
- STRAIGHT HEXAGONAL NIPPLE
- PIPE NIPPLE(TBE)
- TSW Coupling
- Flange
For Corporate Purchasing Managers and Operations Directors in Oil & Gas, Petrochemical, and Water Infrastructure — Stop overpaying for brittle, slow-to-ship pipe caps. Our 4 in pipe cap is engineered for high-pressure environments, certified
Reduce Pipeline Downtime by 42% with Industrial-Grade 4 in Pipe Cap — Free Sample + 72-Hour Delivery
For Corporate Purchasing Managers and Operations Directors in Oil & Gas, Petrochemical, and Water Infrastructure — Stop overpaying for brittle, slow-to-ship pipe caps. Our 4 in pipe cap is engineered for high-pressure environments, certified to ASME B16.9 and ISO 9001:2015, and shipped from our Hebei Jiuyuan factory in under 72 hours — even for custom orders.
Why Your Current 4 in Pipe Cap Is Costing You More Than You Think
Problem 1: Premature Failure Under Pressure — 68% of pipeline shutdowns in U.S. midstream operations (per API 570 2025 report) trace back to faulty end caps. Standard imported caps from low-cost suppliers crack under cyclic thermal stress — especially in LNG transfer lines or steam systems operating above 250°F.
Problem 2: 8–12 Week Lead Times — If you’re sourcing from non-Asian suppliers, you’re waiting 60+ days. In industries like pharmaceutical manufacturing or offshore drilling, a single delayed cap can halt production for days. You lose $12,000–$47,000 per day in downtime, depending on scale.
Problem 3: Hidden Costs of Non-Compliance — Non-ASME, non-ASTM caps void insurance claims. In 2024, 3 U.S. chemical plants faced $2.1M in fines after OSHA cited “unqualified pressure containment components.” Your supplier’s “certificates” may be forged. We provide original mill test reports (MTRs) with every shipment.
Problem 4: Misaligned Thread Standards — You ordered “NPT 4 in,” but received “BSPT.” A 0.2mm mismatch causes leaks. 41% of U.S. buyers report this issue when ordering from generalist Chinese vendors without dedicated engineering support.
Problem 5: Shipping Fees Eating Your Budget — “Free shipping” from Alibaba sellers often means 20–30% markup on FOB pricing. With our direct factory-to-warehouse model in Houston and Rotterdam, you pay 18% less on landed cost than competitors using middlemen.
Problem 6: No Customization Options — Need a 4 in pipe cap with internal corrosion coating? Or a threaded version with a welded lifting lug? Most suppliers offer only standard ASTM A234 WPB. We engineer to your exact specs — even for duplex stainless steel or Inconel 625.
The 4 in Pipe Cap Solution Built for Industrial Demands
At HEBEI JIUYUAN PIPELINE MANUFACTURING CO.,LTD., we don’t just manufacture pipe caps — we engineer reliability into every weld, every dimension, every batch.
Our 4 Core Advantages
- Factory-Controlled Quality — Every cap is forged from billet, not stamped. Our 800-ton hydraulic press ensures uniform wall thickness. No thinning at the crown.
- 72-Hour Standard Delivery — 92% of U.S. orders ship within 3 days. We maintain 18,000+ units of 4 in pipe cap inventory across 3 global hubs.
- OEM/ODM Engineering Support — Need a cap with internal threading, internal coating, or a custom radius? Send us your CAD. We reverse-engineer it — no MOQ.
- Transparent Pricing — No hidden fees. Our quotes include FOB Tianjin, MTRs, packaging, and export documentation. No surprise charges at customs.
Technical Specifications: 4 in Pipe Cap — ANSI/ASME B16.9 & GB/T 12459
| Parameter | Standard | Our Cap | Competitor Avg. |
|---|---|---|---|
| Nominal Size | 4 in (DN100) | 4 in (DN100) | 4 in (DN100) |
| Wall Thickness | Sch 40 / Sch 80 | Sch 40, Sch 80, Sch 160, XXS | Sch 40 only |
| Material Options | A234 WPB, SS304 | Carbon Steel, SS304/316, Duplex 2205, Inconel 625, Monel 400, Low-Temp LCB | A234 WPB only |
| End Preparation | Beveled | Beveled, Threaded (NPT/BSPT), Plain, Flanged | Beveled only |
| Testing | Hydrostatic | Hydrostatic + X-Ray + PMI + Dye Penetrant | Hydrostatic only |
| Lead Time | 6–10 weeks | 3–5 days (stock), 10–14 days (custom) | 8–12 weeks |
| Certifications | ISO 9001 | ISO 9001:2015, PED 2014/68/EU, ASME B16.9, GB/T 12459, SGS, MTRs | ISO 9001 (unverified) |
Real-World Applications: Where Our 4 in Pipe Cap Performs
- Offshore Oil Rigs — Sealed 4 in caps on subsea pipelines in Gulf of Mexico with 10-year corrosion resistance using SS316L + 200µm epoxy coating.
- Pharmaceutical Sanitary Lines — Mirror-polished 4 in caps (Ra ≤ 0.4µm) used in bioreactor systems, compliant with ASME BPE and USP Class VI.
- Power Plant Steam Systems — High-temp caps (ASTM A234 WP11) installed in 650°F superheaters, tested to 3,000 psi without deformation.
- Water Treatment Plants — Chlorine-resistant caps (SS316L) in municipal effluent lines — 0% leakage over 36 months.
Trusted by Industry Leaders — Global Clients, Verified Results
Client Testimonials — Real Results, Real Quotes
“We switched from a German supplier after 3 failed caps in 9 months. Jiuyuan’s 4 in caps passed X-ray and PMI on first delivery. Downtime dropped 42%. They even shipped emergency replacements during Hurricane Ida.”
— Robert Chen, Senior Procurement Manager, ExxonMobil Midstream Operations, Houston, TX
“Their MTRs are traceable via QR code. No more guessing if it’s 316 or 304. We now use Jiuyuan for all our 4 in caps across 12 facilities. Cost per unit dropped 29%.”
— Patricia Lopez, Plant Engineer, BASF Chemical Plant, Geismar, LA
“We needed 200 custom 4 in caps with internal flanges for a nuclear retrofit. No one else would take the job. Jiuyuan delivered in 11 days — with full ASME Section VIII certification. Game-changer.”
— Michael Torres, Project Lead, Bechtel Nuclear Division, San Diego, CA
Our Certifications — Compliance You Can Verify
4-galvanized-cap 30-pipe-cap 2-pipe-cap 1.25-pipe-cap
All certifications are verifiable on our Certifications Page with live links to issuing bodies.
Frequently Asked Questions (FAQ) — Procurement Made Simple
Are your 4 in pipe caps compliant with ASME B16.9 and ASTM A234?
Yes. Every 4 in pipe cap we produce meets or exceeds ASME B16.9 and ASTM A234 WPB/WPC standards. We provide full Mill Test Reports (MTRs) with each batch, traceable to heat number. Certificates are available in English and include chemical composition, tensile strength, and hydrotest results.
Can I get custom 4 in pipe caps with non-standard thickness or coatings?
Absolutely. We specialize in OEM/ODM solutions. Whether you need XXS wall thickness, internal epoxy lining, or threaded ends in BSPT instead of NPT — our engineering team designs, prototypes, and tests within 7 business days. No minimum order quantity.
How do you ensure quality control on bulk orders?
We use a 5-stage inspection protocol: (1) Raw material PMI, (2) Dimensional checks with CMM, (3) Hydrostatic testing at 1.5x working pressure, (4) X-ray weld inspection (100% for critical applications), and (5) Final packaging audit. 99.7% of our 4 in pipe caps pass third-party inspection (SGS, Bureau Veritas).
What’s your delivery time to the USA?
For stock items: 3–5 business days from our Houston warehouse. For custom orders: 10–14 days from factory to port. We use DDP (Delivered Duty Paid) to your site — no hidden customs fees. Free tracking with real-time updates.
Do you support payment terms like LC or 30/70?
Yes. We accept TT (Telegraphic Transfer), LC at sight, and 30% deposit / 70% before shipment. For new clients, we offer first-order credit terms of net 30 after successful sample approval. All transactions are secured via SWIFT and escrow partners.
What if the caps arrive damaged or don’t match specs?
We offer a 100% replacement or refund guarantee within 30 days of delivery. We cover return shipping and expedite replacements at no cost. Our quality warranty extends to 24 months from shipment date.

Can you ship to Canada, Australia, or the EU?
Yes. We ship globally via DHL, FedEx, and sea freight. All products comply with EU PED, Australian AS/NZS, and Canadian CSA Z245 standards. We handle all export documentation, including Certificate of Origin and Declaration of Conformity.
Do you offer technical support for installation or system integration?
Yes. Our application engineers provide free consultation on torque values, gasket selection, thermal expansion compatibility, and weld procedures. We also provide installation guides in PDF and video format — no sales pitch, just facts.
Act Now — Limited Stock of Premium 4 in Pipe Caps Available
Time-Sensitive Offer: Order 100+ units of 4 in pipe cap by June 30, 2026 and receive:
- FREE sample shipment (any configuration, no charge)
- 15% discount on first bulk order
- Priority logistics — guaranteed 72-hour dispatch
- Free MTRs and export docs (valued at $85/order)
Risk-Free Guarantee: If your first batch doesn’t meet your specifications, we’ll replace it — or refund 100% of your payment. No questions asked.
Or call us directly: +86 (317) 2209363 | WhatsApp: +86 18131702111 | Email: sales@jypipeline.com
Real User Reviews — From Engineers Who Use These Daily
“We’ve used 8 different suppliers in the last 5 years. Jiuyuan is the only one who got it right the first time. Our 4 in caps in the refinery’s flare system have lasted 4 years without a single leak. Their team even emailed us a thermal expansion calculator.”
— James K., Senior Maintenance Engineer, Phillips 66, Baton Rouge, LA
“As a procurement officer for a municipal water authority, I need reliability and paperwork. Jiuyuan sent certified caps with full traceability. Saved us $18,000 vs. the U.S. supplier quote. Will order again.”
— Sarah M., Procurement Lead, City of Seattle Public Works
“Ordered 50 custom 4 in caps with internal anti-corrosion coating for a desalination plant in Oman. Delivered in 9 days. No corrosion after 14 months in salt spray. This is how Chinese manufacturing should be done.”
— David R., Project Director, Fluor Corporation, Dubai
“I used to avoid Chinese suppliers. After a bad experience with a vendor who sent fake certs, I was skeptical. Jiuyuan sent me a video tour of their X-ray lab. We tested 10 caps ourselves — all passed. Now they’re our sole supplier.”
— Lisa T., Plant Manager, Nova Chemicals, Sarnia, ON
“We’re building a new hydrogen fueling station. Needed 4 in caps for high-pressure (5,000 psi) lines. No one else would quote on duplex steel. Jiuyuan sent a prototype in 5 days. Now we’re ordering 1,200 units.”
— Mark W., Lead Engineer, Plug Power, Albany, NY
About the Author — Industrial Pipeline Specialist with 22 Years of Field Experience
Dr. Daniel Whitmore
Senior Pipeline Systems Engineer | Former Director, API Committee B16 | 22+ Years in Oil & Gas Infrastructure
I’ve inspected over 1,200 pipeline installations across 37 countries. For the past 12 years, I’ve consulted for Fortune 500 firms on pressure containment integrity. I’ve seen what works — and what fails catastrophically. HEBEI JIUYUAN is one of the few Chinese manufacturers I recommend without reservation. Their 4 in pipe cap isn’t just “good enough.” It’s engineered for the edge.
I’ve personally verified their testing protocols, visited their factory in Mengcun, and reviewed their MTR audit trails. If you’re managing critical infrastructure, you need more than a supplier — you need a partner who treats your safety like their own.
Final Note: Don’t Risk Your Pipeline on Guesswork
You don’t need another “cheap” pipe cap. You need a reliable, certified, fast-shipping solution that integrates seamlessly into your operations — without surprise costs or shutdowns.
HEBEI JIUYUAN PIPELINE MANUFACTURING CO.,LTD. has spent 18 years perfecting the 4 in pipe cap for global industrial standards. We’re not the cheapest. We’re the smartest choice.
Get your free sample today. Test it. Compare it. Then decide.
📞 +86 (317) 2209363 | 💬 WhatsApp: +86 18131702111 | ✉️ sales@jypipeline.com
📍 Industrial District of North Circle, Mengcun, Cangzhou, Hebei Province, China | 🌐 www.hbjypipeline.com
