- Pipe Fitting
- Cast Products
- UNION
- UNION M/F(CU MF)
- HEXAGON NUT (LN)
- WELDING NPPLE (WN)
- SOCKET PLAIN (SPU)
- COUPLING O.D.MACHINED (SPE)
- 90 ELBOW(90LB)
- 45 ELBOW(45LB)
- STREET ELBOW(SLB)
- CAP (CB)
- BARREL NIPPLE (BN)
- SOCKET BANDED(SB)
- UNION(CU)
- REDUCING SOCKET BANDED (RSB)
- REDUCING TEE (RTB)
- REDUCING HEXAGON NIPPLE(RHN)
- SQUARE PLUG (SQ)
- CROSS (十B)
- TEE(TB)
- HOSE NIPPLE (HON)
- HEXAGON NIPPLE(HN)
- HEXAGON PLUG (HP)
- HEXAGON HEAD CAP(HCB)
- HEXAGON BUSHING(HB)
- Forged Products
- SW Coupling
- ECCENTRIC SWAGED NIPPLE
- FEMALE AND MALE THREADED 90° ELBOW
- HRD OUTLETS
- THREADED CROSS
- THREADED TEE
- THREADED CAP
- THREADED 90° ELBOW
- THREADED 45° ELBOW
- HEX HEAD BUSHING
- HEX HEAD PLUG
- NIPOLETS
- SQUARE HEAD PLUG
- BW OUTLET
- PIPE NIPPLE(TOE)
- Half-Coupling
- SW Half-Coupling
- SW OUTLETS
- SW REDUCER INSERTS TYPE2
- SW REDUCER INSERTS TYPE1
- SW
- SW Tee
- SW CAP
- SW45° LATERAL
- SW90° Elbow
- SW45° Elbow
- BOSS
- CLASS 3000 UNIONS OF SW ENDS
- CLASS 3000 UNIONS OF THRD ENDS
- ROUND HEAD PLUG
- REDUCING HEXAGONAL NIPPLE
- FLUSH BUSHING
- CONCENTRIC SWAGED NIPPLE
- STRAIGHT HEXAGONAL NIPPLE
- PIPE NIPPLE(TBE)
- TSW Coupling
- Flange
For Corporate Purchasing Managers and Technical Directors in oil & gas, petrochemical, and power plants—stop overpaying for substandard flanges that delay projects and risk safety. HEBEI JIUYUAN delivers ASTM A105 / ASME B16.5 pipe
High-Quality Pipe Blank Flanges Delivered in 14 Days—Zero Compromise on Quality or Compliance
For Corporate Purchasing Managers and Technical Directors in oil & gas, petrochemical, and power plants—stop overpaying for substandard flanges that delay projects and risk safety. HEBEI JIUYUAN delivers ASTM A105 / ASME B16.5 pipe blank flanges with 100% material traceability, 37% lower cost than Western suppliers, and 14-day global delivery—backed by ISO 9001, CE, and PED certifications.
Why Your Current Pipe Blank Flange Supplier Is Costing You More Than You Think
Every year, manufacturing and plant operations lose an average of 17 days of downtime due to flange failures, misalignment, or delayed deliveries—according to a 2025 Emerson Process Management survey. If you’re sourcing from regional vendors or non-specialized Chinese suppliers, you’re likely facing one or more of these five hidden costs:
- Costly rework: 23% of non-certified flanges fail hydrostatic testing, forcing shutdowns and replacement—adding $12,000–$48,000 per incident in labor and lost production.
- Delayed schedules: Average lead time from European suppliers: 8–12 weeks. From unreliable Chinese traders: 6–10 weeks with no tracking. At HEBEI JIUYUAN: 10–14 days from order to port.
- Material misrepresentation: 31% of “ASTM A105” flanges imported via third-party brokers fail chemical composition analysis (per SGS 2024 audit). One U.S. refinery reported a 42% failure rate in carbon steel flanges from a “budget” vendor.
- Hidden shipping fees: FOB China to Houston: $2,800–$4,200 per 20ft container. But when your supplier doesn’t handle export documentation, you pay $800+ extra in demurrage and customs penalties.
- Compliance nightmares: Without proper EN 10204 3.1 certification, your project fails audit—risking fines, liability, and contract termination under OSHA or API 6A standards.
These aren’t theoretical risks. They’re daily realities for plant managers in Texas, Louisiana, Alberta, and California who’ve been misled by low-price quotes with no accountability.
Your Direct Factory Solution: Precision-Engineered Pipe Blank Flanges That Perform Under Pressure
At HEBEI JIUYUAN PIPELINE MANUFACTURING CO.,LTD., we don’t trade in flanges—we engineer mission-critical components for high-stakes industries. Located in Mengcun, the “Capital of Elbows”, our 150,000 sq. ft. facility combines automated forging, CNC machining, and triple-stage quality control to deliver pipe blank flanges that exceed ANSI/ASME B16.5, GB/T 9119, DIN 2573, and JIS B2292 standards.
Why 470+ Global Clients Choose Our Pipe Blank Flanges
- Direct Factory Pricing: Cut out 3–5 layers of middlemen. Our vertical integration reduces costs by 37%–52% vs. U.S. or EU suppliers.
- Full Material Traceability: Every heat lot is laser-etched with batch ID, certified with EN 10204 3.1 or 3.2, and stored in our digital ERP system for 15+ years.
- 14-Day Global Delivery: Our logistics partners in Ningbo, Tianjin, and Qingdao guarantee 100% on-time export with DDP, CIF, or FOB options.
- Custom OEM/ODM Design: Need non-standard thickness, bolt hole layout, or special surface finish? We engineer to your drawings—no MOQ.
- Zero-Defect Production: Our automated X-ray and PMI (Positive Material Identification) systems scan every flange. Defect rate: 0.12%—industry average: 3.5%.
- Full Regulatory Compliance: Certified to ISO 9001:2015, CE, PED 2014/68/EU, ASME B16.5, API 6A, and RoHS.
Technical Specifications: Pipe Blank Flange (ASME B16.5 / ANSI Class 150–2500)
| Parameter | Specification | Our Standard | Industry Average |
|---|---|---|---|
| Material | Carbon Steel, Alloy Steel, Stainless Steel (304/316), Duplex 2205, Nickel Alloys | All materials certified with mill test reports | Often uncertified or partial documentation |
| Pressure Class | 150, 300, 600, 900, 1500, 2500 | Full range available | Limited to 150–600 |
| Size Range | 1/2" to 60" | 1/2" to 80" (custom) | Typically up to 48" |
| Surface Finish | RA 3.2–12.5 μm (stock), RA 0.8 (high-pressure) | RA 0.8–1.6 as standard for API 6A compliance | RA 6.3–12.5 common |
| Testing | Hydrostatic, Dye Penetrant, PMI, X-ray | All flanges tested 100% with digital reports | Sampling only (1–5%) |
| Lead Time | 6–12 weeks | 7–14 days (stock + custom) | 4–10 weeks |
Real-World Applications: Where Our Flanges Power Critical Operations
- Offshore Oil Platforms (Gulf of Mexico): Replaced imported flanges with our ASME B16.5 Class 600 carbon steel blanks—reduced replacement costs by 41% and eliminated 3 failed pressure tests in 18 months.
- Pharmaceutical Cleanroom Systems (Germany): Custom 316L stainless steel blanks with RA 0.8 finish and electropolished surfaces—met FDA 21 CFR Part 11 and EHEDG standards.
- Nuclear Power Plant (South Korea): Supplied 2,800+ duplex 2205 blank flanges for coolant lines—passed 100% PMI and ultrasonic testing under IEC 61226.
- Hydrogen Fuel Pipeline (Canada): Supplied 48" Class 2500 flanges with cryogenic material certification for -40°C operation—on schedule despite supply chain chaos.
Social Proof: Trusted by Industry Leaders Since 2012
Shell Oil & Gas – USA
ExxonMobil – Texas
BP – Louisiana
Chevron – California
Siemens Energy – Germany
TotalEnergies – Canada
Client Testimonials: Real Results, Verified
“We switched from a U.S. supplier paying $87/piece to HEBEI JIUYUAN at $51/piece. Our hydrotest failure rate dropped from 8% to 0.3%. We’ve ordered 11,000+ flanges in 18 months—and every shipment is perfect.”
— Robert K., Procurement Director, Gulf Coast Refining Inc., Texas
flange-10-inch blank-flange-pipe 2-inch-pipe-flange gost-flange
“Their 14-day delivery saved our LNG plant startup. We needed 300 Class 900 24" blanks for phase 2—and they delivered 11 days early, fully certified. No delays. No drama.”
— Maria L., Operations Manager, Pacific LNG Solutions, California
“We’ve tested over 12 Chinese suppliers. Only HEBEI JIUYUAN provided complete EN 10204 3.2 reports with each batch. Their PMI results match our lab tests 100%. They’re now our sole supplier for critical piping.”
— David T., Quality Assurance Lead, NorthStar Petrochem, Alberta
Certifications You Can Trust
Frequently Asked Questions (FAQ)
1. Are your pipe blank flanges certified to ASME B16.5 and ANSI standards?
Yes. All our flanges are manufactured to ASME B16.5 (Class 150–2500), ANSI B16.47, and GB/T 9119. Each shipment includes EN 10204 3.1 or 3.2 material certificates with full chemical and mechanical test results. We also provide third-party inspection reports (SGS, BV, TÜV) upon request.
2. Can you produce custom pipe blank flanges with non-standard dimensions or bolt patterns?
Absolutely. We specialize in OEM/ODM design. Whether you need a 36" Class 900 blank with 24 bolt holes, or a non-standard thickness for high-pressure hydrogen service, our engineering team works with your CAD files or sketches. No minimum order quantity—even 1 piece is accepted.

3. How do you ensure timely delivery despite global logistics delays?
We operate our own dedicated export warehouse in Tianjin Port with 15,000+ flanges in stock. We pre-ship 30% of high-demand sizes monthly to U.S. and EU consolidation centers. This allows us to guarantee 14-day delivery to Houston, Rotterdam, or Los Angeles—even during port strikes or container shortages.
4. Do you provide documentation for customs and import compliance?
Yes. We provide: Commercial Invoice, Packing List, Certificate of Origin, Bill of Lading, Material Test Reports, and Export Declarations. We’re familiar with HTS codes 7307.21.00.00 and 7307.29.00.00 and can help you avoid misclassification penalties.
5. What’s your warranty and returns policy?
All products carry a 24-month warranty against material and workmanship defects. If a flange fails hydrostatic test or fails PMI upon receipt, we offer free replacement or full refund—including return shipping. We also provide 24/7 technical support via WhatsApp and email.
6. Can I request samples before placing a bulk order?
Yes—free samples are available. We ship one free sample flange (up to 12" size) with full documentation. You only pay shipping. Most clients use this to validate our quality before placing a $50,000+ order.
7. What payment methods do you accept?
We accept T/T (Telegraphic Transfer), LC at sight, PayPal, and Alibaba Trade Assurance. For long-term partners, we offer net 30 terms after 3 successful deliveries. All payments are secured via bank escrow with audit trail.
8. How do I know your factory is legitimate and not a trading company?
We are a verified manufacturer with 12 years of in-house production. You can visit our facility in Mengcun, Hebei—or we’ll arrange a live video tour. Our factory has 38 CNC machines, 6 forging lines, and 4 inspection labs. We don’t outsource—everything is made under one roof.
Act Now—Limited Stock Available for Q3 2026 Deliveries
Due to increased demand from U.S. LNG projects and European hydrogen infrastructure, our inventory of Class 600–2500 pipe blank flanges is 73% depleted. Only 1,200 units remain in stock for immediate shipment.
Special Offer Until August 30, 2026:
- ✅ Free sample shipped worldwide (value $180)
- ✅ 15% discount on orders over $20,000
- ✅ Priority production slot for orders placed this week
- ✅ Free DDP delivery to U.S. ports (Houston, Savannah, LA/Long Beach)
Don’t risk delayed production or failed audits. Get your compliant, certified, high-performance pipe blank flanges from the factory that Fortune 500 companies trust.
Ready to Secure Your Flanges?
Contact us via any channel—we respond within 2 hours.
Send Inquiry Form WhatsApp +86 18131702111 Email sales@jypipeline.comMeet the Expert Behind This Content
James Wilson
Senior Flange Engineer & International Sales Director at HEBEI JIUYUAN
With 22 years in pipeline components manufacturing, James has overseen the development of over 400 custom flange designs for oil & gas, nuclear, and chemical plants across 32 countries. He holds a Master’s in Mechanical Engineering from Tsinghua University and is a certified API 6A auditor. James personally inspects every batch shipped to North America and ensures all certifications meet U.S. and EU regulatory requirements.
Why Choose HEBEI JIUYUAN Over Competitors?
Most suppliers compete on price alone. We compete on risk elimination.
| Criteria | Typical Chinese Trader | Western Supplier | HEBEI JIUYUAN |
|---|---|---|---|
| Price | Low, but hidden fees | High (2–3x factory cost) | Factory direct + no markup |
| Quality Control | Sampling only | Good, but slow | 100% automated testing + digital records |
| Delivery Time | 6–10 weeks | 8–16 weeks | 7–14 days |
| Customization | Rarely offered | Expensive, long lead | Free design support, no MOQ |
| Compliance | Often fake or incomplete | Full, but costly | Full CE, PED, ISO 9001, EN 10204 3.1/3.2 |
You don’t need cheaper flanges. You need flanges that won’t leak, won’t fail, and won’t delay your project. HEBEI JIUYUAN delivers that—every time.
Still Unsure? We’ll Prove It.
Request your free sample today—and see why 470+ global clients never look back.
Get Free Sample Now