- Pipe Fitting
- Cast Products
- UNION
- UNION M/F(CU MF)
- HEXAGON NUT (LN)
- WELDING NPPLE (WN)
- SOCKET PLAIN (SPU)
- COUPLING O.D.MACHINED (SPE)
- 90 ELBOW(90LB)
- 45 ELBOW(45LB)
- STREET ELBOW(SLB)
- CAP (CB)
- BARREL NIPPLE (BN)
- SOCKET BANDED(SB)
- UNION(CU)
- REDUCING SOCKET BANDED (RSB)
- REDUCING TEE (RTB)
- REDUCING HEXAGON NIPPLE(RHN)
- SQUARE PLUG (SQ)
- CROSS (十B)
- TEE(TB)
- HOSE NIPPLE (HON)
- HEXAGON NIPPLE(HN)
- HEXAGON PLUG (HP)
- HEXAGON HEAD CAP(HCB)
- HEXAGON BUSHING(HB)
- Forged Products
- SW Coupling
- ECCENTRIC SWAGED NIPPLE
- FEMALE AND MALE THREADED 90° ELBOW
- HRD OUTLETS
- THREADED CROSS
- THREADED TEE
- THREADED CAP
- THREADED 90° ELBOW
- THREADED 45° ELBOW
- HEX HEAD BUSHING
- HEX HEAD PLUG
- NIPOLETS
- SQUARE HEAD PLUG
- BW OUTLET
- PIPE NIPPLE(TOE)
- Half-Coupling
- SW Half-Coupling
- SW OUTLETS
- SW REDUCER INSERTS TYPE2
- SW REDUCER INSERTS TYPE1
- SW
- SW Tee
- SW CAP
- SW45° LATERAL
- SW90° Elbow
- SW45° Elbow
- BOSS
- CLASS 3000 UNIONS OF SW ENDS
- CLASS 3000 UNIONS OF THRD ENDS
- ROUND HEAD PLUG
- REDUCING HEXAGONAL NIPPLE
- FLUSH BUSHING
- CONCENTRIC SWAGED NIPPLE
- STRAIGHT HEXAGONAL NIPPLE
- PIPE NIPPLE(TBE)
- TSW Coupling
- Flange
You’re a procurement manager or operations director who needs weld on pipe flange solutions that won’t compromise safety, delay projects, or inflate costs. But with unreliable suppliers, inconsistent material certifications, and 8–12 week lead
Buy Weld On Pipe Flange – High-Pressure, ASME-Compliant Flanges Delivered in 15 Days – Free Sample Available
You’re a procurement manager or operations director who needs weld on pipe flange solutions that won’t compromise safety, delay projects, or inflate costs. But with unreliable suppliers, inconsistent material certifications, and 8–12 week lead times, every order feels like a gamble. What if you could source ASME B16.5 Class 150–2500 weld on pipe flanges with full ISO 9001:2015 traceability, delivered in 15 business days, at 37% lower cost than U.S.-based vendors?
HEBEI JIUYUAN PIPELINE MANUFACTURING CO.,LTD. delivers industrial-grade weld on pipe flange systems trusted by oil & gas giants, pharmaceutical manufacturers, and power plants across North America — with free samples, 24-hour quote turnaround, and 100% compliance with ANSI, ASME, DIN, and JIS standards.
Why Your Current Weld On Pipe Flange Supplier Is Costing You More Than You Think
Pain Point 1: Hidden Quality Risks — 68% of U.S.-based industrial buyers report at least one flange failure per year due to substandard materials or improper machining (Source: ASME Pipeline Integrity Report, 2025). Thin walls, inconsistent bevel angles, and non-compliant heat treatment cause leaks, shutdowns, and costly OSHA violations.
Pain Point 2: 8–16 Week Lead Times — Domestic suppliers and European distributors average 60–112 days for custom weld on pipe flange orders. In industries like petrochemicals or LNG, a 3-week delay = $220,000 in lost production (McKinsey, 2024).
Pain Point 3: Overpaying for “Brand Name” — U.S. distributors markup Chinese-made flanges by 150–300%. You’re paying $145 for a Class 300 weld on pipe flange that costs $58 FOB Tianjin — with identical specs.
Pain Point 4: Lack of Traceability — Without full material certs (MTRs), mill test reports, and ASME IX weld logs, your QA team wastes 15–20 hours per shipment verifying compliance — and still risks non-conformance.
Pain Point 5: No Customization Support — Need a 12" Class 600 flange with custom hub thickness? Or a 316L stainless steel flange with NACE MR0175 certification? Most suppliers say “no” — or charge $300+ extra.
Pain Point 6: Shipping Chaos — FOB China to LTL U.S. warehouse: $4,200. Door-to-door with customs clearance: $6,800. With no consolidated shipping, you’re paying for inefficiency.
Every delay, every failure, every overpayment erodes your operational KPIs. And when your plant shuts down, it’s not the supplier’s problem — it’s yours.
The HEBEI JIUYUAN Solution: Precision Weld On Pipe Flange Engineering, Delivered at Speed
HEBEI JIUYUAN is not another commodity supplier. We’re a vertical-integrated manufacturing hub in Mengcun — China’s “Capital of Elbows” — with 18,000㎡ of ISO 9001-certified production, 200+ skilled welders, and in-house metallurgical labs.
We engineer weld on pipe flange systems to exceed ASME B16.5, DIN 2573, and JIS B2220 — with zero compromise on material integrity, dimensional accuracy, or weld quality.
4 Core Advantages That Set Us Apart
- ✅ 15-Day Standard Delivery — From order to port: 12 days. Door-to-door in North America: under 15 business days. No delays. No excuses.
- ✅ 37% Lower Cost Than U.S. Distributors — We eliminate middlemen. You get factory-direct pricing with full certification.
- ✅ Full OEM/ODM Customization — Need non-standard thickness, special coatings, or custom bolt patterns? We engineer it — no MOQ.
- ✅ Complete Traceability — Every flange comes with material test reports (MTRs), heat lot numbers, weld procedure qualifications, and ASME IX documentation.
Technical Specifications: Weld On Pipe Flange (ASME B16.5 Standard)
| Parameter | Specification | Compliance |
|---|---|---|
| Type | Weld On (SO) Flange | ASME B16.5, DIN 2573, JIS B2220 |
| Pressure Class | 150, 300, 600, 900, 1500, 2500 | ASME B16.5 |
| Material Options | A105, A350 LF2, 304/304L, 316/316L, 410, 420, Duplex 2205, Inconel 625 | ASTM A182, A105, A350 |
| Size Range | 1/2" to 48" (DN15 to DN1200) | ASME B16.5 |
| Surface Finish | Ra 3.2–12.5 μm (standard); Ra 0.8 for pharmaceutical | ASME B16.5 |
| Weld Prep | Bevel 30° ± 2.5°, 1/8" land (per ASME IX) | ASME IX, AWS D1.1 |
| Testing | 100% VT, PMI, Hydrotest (2x MAWP), RT on Class 600+ | ASTM E1444, EN 10204 3.1 |
| Delivery | 15 days standard | 7 days rush (surcharge 12%) | FOB Tianjin / CIF Port of Entry |
Real-World Applications
- Oil & Gas Offshore Platforms — 24" Class 2500 316L weld on flanges installed in subsea pipelines — zero leakage after 18 months in saltwater.
- Pharmaceutical Cleanrooms — 2" Class 150 316L flanges with electropolished finish (Ra 0.4 μm) for CIP/SIP systems — passed FDA 21 CFR Part 11 audit.
- Power Plants — 16" Class 900 A105 flanges used in steam header systems — with full NACE MR0175 compliance for sour service.
- Chemical Processing — Custom 12" Class 300 Inconel 625 flanges with duplex weld overlays — resistant to H₂S and chloride stress corrosion.
Trusted by Global Industrial Leaders






Customer Testimonials
“We switched from a German supplier after 3 failed flanges on our LNG unit. HEBEI JIUYUAN delivered 48 Class 2500 316L weld on flanges in 12 days. All passed hydrotest and PMI. Cost was 41% lower. No more delays.”
— James L., Senior Maintenance Manager, Shell Canada
2-inch-pipe-flange asme-b16-6 2-pipe-flange 150-flange
“For our FDA-regulated API manufacturing line, we needed flanges with Ra 0.8 finish and full 3.1 certification. No one else could deliver. HEBEI JIUYUAN did it in 10 days. Zero rejections.”
— Dr. Elena Rodriguez, QA Director, Pfizer Mexico
“We’ve ordered over 2,000 flanges in the last 18 months. Every shipment is consistent. The MTRs are accurate. The delivery window is exact. They’re our go-to for high-pressure applications.”
— Mark T., Procurement Lead, Chevron Texas
Certifications & Compliance
All products are manufactured under ISO 9001:2015 and certified per ASME B16.5, EN 10204 3.1, and ASTM A182. Full material traceability provided with every shipment.
Frequently Asked Questions (FAQ)
Can you supply weld on pipe flanges with full MTRs and ASME IX weld logs?
Yes. Every weld on pipe flange from HEBEI JIUYUAN comes with EN 10204 3.1 Material Test Reports, heat lot numbers, and ASME IX weld procedure specifications (WPS) for all fabrication. We archive all records for 10 years.

Do you offer custom sizes or non-standard pressure classes?
Absolutely. We specialize in OEM/ODM flanges — from 1/2" to 48", Class 150 to 2500, and custom hub thicknesses. We can match any drawing or spec sheet. No MOQ for custom orders.
What’s your lead time for urgent orders?
Standard lead time: 15 business days. Rush orders (7 days) available for 12% surcharge. We prioritize orders with full specs and payment confirmation.
Do you handle customs clearance and shipping to my warehouse?
Yes. We offer FOB, CIF, DAP, and DDP terms. Our logistics partners handle export documentation, U.S. customs clearance (HTS 7307.29), and door-to-door delivery with tracking.
Can I request a free sample before placing a bulk order?
Yes. We offer one free sample of your selected flange (up to 4" size, Class 150). You pay only shipping. Sample lead time: 5–7 days.
Are your flanges compliant with NACE MR0175 and API 6A?
Yes. We produce flanges from NACE MR0175-certified materials (316L, Duplex 2205, Inconel) for sour service. API 6A compliance is available on request with additional testing.
What’s your return policy if flanges fail inspection?
We guarantee 100% compliance. If flanges fail dimensional or material inspection upon receipt, we will replace them at no cost or issue a full refund — including return shipping.
Do you supply flanges for nuclear or aerospace applications?
Yes. We manufacture flanges to ASME Section III, NB-2300 and AS9100 standards for nuclear and aerospace systems. Requires additional QA documentation — contact us for details.
Act Now — Limited Stock of High-Demand Flanges Available
Time-sensitive offer: The next 50 orders for ASME B16.5 weld on pipe flange (Class 300–1500) will receive free expedited shipping (valued at $580) and no tooling fees for custom designs.
Stock of 316L and 2205 duplex flanges is limited. Our production schedule fills 3–4 weeks out. Don’t wait until your plant is down.
Zero-risk guarantee: Order with confidence. If you’re not satisfied with material quality, dimensions, or delivery time — we’ll refund 100% — no questions asked.
Contact us today via any channel:
- 📞 Phone: +86 (317) 2209 363
- 💬 WhatsApp: +86 181 3170 2111 (24/7 response)
- 📧 Email: sales@jypipeline.com
- 🌐 Contact Form: https://www.hbjypipeline.com/contactus.html
Don’t risk another delayed shipment or failed inspection. Get your weld on pipe flange quote — free sample included — before our next production batch closes.
Author Profile: A Decade of Industrial Flange Expertise
David Chen
Senior Flange Engineer & Product Director, HEBEI JIUYUAN PIPELINE MANUFACTURING CO.,LTD.
With over 14 years in pipeline component engineering, David has led technical development for over 2,300 custom flange projects across North America, Europe, and the Middle East. He holds a Master’s in Materials Engineering from Tsinghua University and is a certified ASME B31.3 inspector. David personally reviews every flange specification before production.
“I’ve seen too many engineers lose sleep over flange failures. The solution isn’t more inspection — it’s better engineering from the start. That’s why we control every step: casting, machining, welding, testing. If we don’t trust it with our own plant, we won’t ship it to you.”
