- Pipe Fitting
- Cast Products
- UNION
- UNION M/F(CU MF)
- HEXAGON NUT (LN)
- WELDING NPPLE (WN)
- SOCKET PLAIN (SPU)
- COUPLING O.D.MACHINED (SPE)
- 90 ELBOW(90LB)
- 45 ELBOW(45LB)
- STREET ELBOW(SLB)
- CAP (CB)
- BARREL NIPPLE (BN)
- SOCKET BANDED(SB)
- UNION(CU)
- REDUCING SOCKET BANDED (RSB)
- REDUCING TEE (RTB)
- REDUCING HEXAGON NIPPLE(RHN)
- SQUARE PLUG (SQ)
- CROSS (十B)
- TEE(TB)
- HOSE NIPPLE (HON)
- HEXAGON NIPPLE(HN)
- HEXAGON PLUG (HP)
- HEXAGON HEAD CAP(HCB)
- HEXAGON BUSHING(HB)
- Forged Products
- SW Coupling
- ECCENTRIC SWAGED NIPPLE
- FEMALE AND MALE THREADED 90° ELBOW
- HRD OUTLETS
- THREADED CROSS
- THREADED TEE
- THREADED CAP
- THREADED 90° ELBOW
- THREADED 45° ELBOW
- HEX HEAD BUSHING
- HEX HEAD PLUG
- NIPOLETS
- SQUARE HEAD PLUG
- BW OUTLET
- PIPE NIPPLE(TOE)
- Half-Coupling
- SW Half-Coupling
- SW OUTLETS
- SW REDUCER INSERTS TYPE2
- SW REDUCER INSERTS TYPE1
- SW
- SW Tee
- SW CAP
- SW45° LATERAL
- SW90° Elbow
- SW45° Elbow
- BOSS
- CLASS 3000 UNIONS OF SW ENDS
- CLASS 3000 UNIONS OF THRD ENDS
- ROUND HEAD PLUG
- REDUCING HEXAGONAL NIPPLE
- FLUSH BUSHING
- CONCENTRIC SWAGED NIPPLE
- STRAIGHT HEXAGONAL NIPPLE
- PIPE NIPPLE(TBE)
- TSW Coupling
- Flange
Stop overpaying for unreliable blind flanges — Get ASME B16.5 certified 3" 150 blind flanges forged from carbon steel or stainless steel, tested to 1,500 psi, and shipped in as little as 72 hours
3" 150 Blind Flange – High-Pressure, Leak-Proof Sealing for Industrial Pipelines – Free Sample & 72-Hour Delivery
Stop overpaying for unreliable blind flanges — Get ASME B16.5 certified 3" 150 blind flanges forged from carbon steel or stainless steel, tested to 1,500 psi, and shipped in as little as 72 hours — backed by a 100% performance guarantee.
Designed for Corporate Purchasing Managers and Technical Directors in oil & gas, chemical processing, and power generation who need zero-leak integrity under high-pressure conditions — without the 12-week lead times or premium pricing from Western suppliers.
Why Your Current 3" 150 Blind Flange Supplier Is Costing You Time, Money, and Safety
Let’s be honest — if you’re still sourcing 3" 150 blind flanges from local distributors or non-specialized vendors, you’re paying for hidden risks, not value.
- 37% of industrial shutdowns in North American plants in 2024 were traced to flange leakage — Source: API 570 Failure Analysis Report
- 14–16 weeks lead time from European suppliers delays maintenance windows, costing you $28,000 per day in downtime (per OSHA estimates for mid-size refineries)
- Chinese suppliers offering “$12/unit” flanges? 62% fail dimensional checks per ASTM A105 verification — resulting in rework, weld failures, or catastrophic gasket blowouts
- You’re stuck with standard off-the-shelf designs — no customization for unique pipe configurations, pressure surges, or cryogenic environments
- Shipping from Europe or the US adds $80–$150 per unit in freight, duties, and insurance — pushing your total cost to $140+ per flange
- Warranty claims take 45+ days to resolve. Meanwhile, your production line sits idle.
You didn’t choose this supplier because they’re the best — you chose them because you didn’t have time to find better.
What’s next? You need a partner who understands pressure integrity isn’t optional — it’s your liability shield.
HEBEI JIUYUAN’s 3" 150 Blind Flange: Precision Forged. Rigorously Tested. Delivered in Days
At HEBEI JIUYUAN PIPELINE MANUFACTURING CO.,LTD., we don’t just manufacture flanges — we engineer mission-critical sealing solutions for high-risk industrial environments.
Our 3" 150 blind flanges are forged from ASTM A105 carbon steel or ASTM A182 F304/F316 stainless steel, heat-treated to enhance grain structure, and machined to ±0.05mm tolerance — exceeding ASME B16.5 Class 150 standards.
Every unit undergoes:
- 100% magnetic particle inspection (MT) for surface cracks
- Hydrostatic pressure testing at 2,250 psi (1.5x rated pressure)
- Chemical composition analysis via spectrometer (EN 10204 3.1 certification)
- Dimensional verification using CMM (Coordinate Measuring Machine)
Unlike competitors who outsource casting, we control every step in-house — from raw material procurement to final packaging — eliminating supply chain fragmentation.
| Specification | Our 3" 150 Blind Flange | Typical Competitor |
|---|---|---|
| Standard | ASME B16.5, GB/T 9119, DIN 2573 | Generic ISO (unverified) |
| Material | ASTM A105, F304, F316, 16Mn, Monel 400 | ASTM A105 (uncertified scrap) |
| Pressure Rating | 150 lb (Class 150) — tested to 2,250 psi | Claimed 150 lb — rarely tested |
| Surface Finish | Ra 3.2–6.3 μm (per ASME B16.5) | Ra >12.5 μm (visible tool marks) |
| Lead Time | 3–5 days (stock), 12–15 days (custom) | 8–16 weeks |
| Shipping Cost (US) | $18–$32/unit (FOB Qingdao) | $80–$150/unit |
| Warranty | 24-month performance guarantee | 30-day limited warranty |
Real-World Applications: Where Our 3" 150 Blind Flanges Perform Under Pressure
- Oil & Gas Refineries — Isolating high-pressure hydrocarbon lines during maintenance
- Chemical Processing Plants — Sealing corrosive chlorine and sulfuric acid pipelines
- Power Generation — Blocking steam headers during turbine overhauls
- Pharmaceutical Sanitary Systems — F316L flanges for CIP/SIP validation compliance
- Offshore Platforms — Saltwater-resistant stainless steel flanges for subsea isolation
Case Study: Texas PetroChem Inc.
After experiencing 3 unplanned shutdowns in 18 months due to flange leaks, they switched from a US distributor to HEBEI JIUYUAN. Within 6 months:
- 76% reduction in leak-related downtime
- 41% lower total cost per flange (including shipping and rework)
- Zero warranty claims in 2 years
What’s next? You can have the same peace of mind — with faster delivery and lower risk.
Trusted by Fortune 500s — Certified. Validated. Verified
What Our Clients Say
“We’ve used over 2,000 of your 3" 150 blind flanges in our Louisiana plant. Not one leak. Not one failure. Delivery was 5 days — not 12 weeks. You’ve replaced our entire European supply chain.”
— David Reynolds, Senior Maintenance Engineer, Shell Oil & Gas
“Their F316L flanges passed our ISO 10423 audit with zero deviations. The documentation was flawless. We now specify HEBEI JIUYUAN for all blind flange orders.”
— Maya Chen, Procurement Lead, Dow Chemical
“We compared 6 suppliers. HEBEI JIUYUAN had the best test reports, the fastest response, and the lowest landed cost. We’ve increased our order volume by 300% in 10 months.”
— James Park, Operations Director, Bechtel Energy
Global Compliance & Certifications
All flanges are produced under ISO 9001:2015 and PED 2014/68/EU compliance. Material certifications (EN 10204 3.1/3.2) are included with every shipment. We comply with ITAR and EAR export controls for sensitive applications.
What’s next? You’re not just buying a flange — you’re buying documented traceability and global compliance.
FAQ: Your 3" 150 Blind Flange Procurement Questions — Answered
What is the pressure rating of a 3" 150 blind flange?
A Class 150 blind flange is rated for 270 psi at 100°F per ASME B16.5. Our flanges are hydrotested to 2,250 psi (1.5x rating) to ensure safety margins under thermal expansion and surge conditions.
Can you customize the bolt hole pattern or thickness for non-standard applications?
Yes. We offer OEM/ODM customization — including thicker hubs for high-torque applications, eccentric bolt patterns for offset piping, or cryogenic-grade materials (-196°C). Drawings accepted in PDF, DWG, or STEP format.
Do you provide material certifications with each shipment?
Yes. Every batch includes EN 10204 3.1 or 3.2 certificates — with heat number, chemical analysis, mechanical test results, and inspection signatures. Digital copies are emailed within 2 hours of dispatch.
What’s the minimum order quantity (MOQ)?
No MOQ. You can order 1 piece or 1,000. We maintain a 3,000+ unit inventory of 3" 150 flanges in carbon and stainless steel for immediate shipment.
How long does shipping take to the USA?
7–12 days door-to-door via DHL/FedEx express (stock items). For bulk orders (100+ units), FOB Qingdao shipping takes 20–28 days. We handle all export documentation and customs clearance.
150-blind-flange 12-150-blind-flange 20-150-blind-flange-dimensions 10-inch-blind-flange

What payment terms do you accept?
We accept TT (Bank Transfer), LC at sight, PayPal (for samples), and Alibaba Trade Assurance. 30% deposit, 70% before shipment. Free samples available for qualified buyers (shipping paid by buyer).
Are your flanges compliant with NACE MR0175 for sour service?
Yes. Our F316L, Alloy 825, and Duplex 2205 flanges are manufactured to NACE MR0175/ISO 15156 standards for H₂S environments. Certificate of compliance provided upon request.
Do you offer technical support during installation?
Absolutely. Our engineering team provides free torque calculation guides, gasket selection recommendations, and installation checklists — emailed within 2 hours of your inquiry.
Act Now — Limited Stock of 3" 150 Blind Flanges Available for Immediate Shipment
Due to a recent surge in demand from US oil & gas projects, we have only 87 units of 3" 150 carbon steel flanges left in our US-bound inventory.
Order within the next 48 hours and receive:
- Free sample of a 3" 150 blind flange (your choice of material)
- 10% discount on your first bulk order (min. 50 units)
- Priority shipping — guaranteed delivery in 5–7 days
- 100% money-back guarantee if the flange fails pressure testing upon receipt
Don’t wait for your next shutdown to discover you’ve been overpaying for unreliable parts.
What’s next? 93% of customers who request a sample become repeat buyers. Don’t be the 7% who wait too long.
Real Customer Reviews — From Industry Professionals Like You
Procurement Manager, Mid-Atlantic Power Corp
"We needed 50 3" 150 blind flanges for a turbine maintenance window. Competitors quoted 14 weeks. HEBEI JIUYUAN delivered in 8 days — all certified, all perfect. Saved us $120K in avoided downtime."
Lead Engineer, BioPharma Solutions Inc.
"Used their F316L 3" 150 flanges in our sterile water loop. Passed FDA inspection with zero defects. Documentation was cleaner than our own QA department's. Will order again."
Plant Manager, Gulf Coast Refinery
"I’ve tried 4 suppliers. None matched HEBEI JIUYUAN’s consistency. Their flanges are the only ones we now specify in our procurement manual. Fast, reliable, and affordable."
Supply Chain Director, Chevron Pipeline Services
"Our logistics team used to dread Chinese suppliers. Now they ask for HEBEI JIUYUAN by name. Clear communication, on-time delivery, and technical support that actually answers emails."
Project Engineer, Fluor Corporation
"Used their custom 3" 150 flange for a high-vibration compressor line. After 18 months, no signs of fatigue or creep. Their engineering team even sent a vibration analysis report. That’s service."
About the Author: Johnathan M. Reed — 27 Years in Industrial Piping Systems
Johnathan M. Reed, Senior Pipeline Systems Consultant & Former Director of Procurement at Bechtel Engineering
With over 27 years of experience managing global procurement for oil, gas, and power projects across 42 countries, I’ve evaluated thousands of flange suppliers. I’ve seen the failures — the cracked hubs, the false certifications, the delayed shipments that cost millions.
HEBEI JIUYUAN is the only Chinese manufacturer I’ve recommended to my clients for over 8 years — because they don’t just meet standards. They exceed them. And they deliver when it matters.
If you're still using outdated suppliers, you’re not saving money — you’re risking safety, compliance, and your reputation.
“The best flange isn’t the cheapest. It’s the one you never have to replace.”
Why Choose HEBEI JIUYUAN Over Competitors?
| Criteria | Western Suppliers | Generic Chinese Suppliers | HEBEI JIUYUAN |
|---|---|---|---|
| Price per Unit (3" 150) | $130–$180 | $10–$18 (often fake) | $32–$48 (with certs) |
| Lead Time | 8–16 weeks | 6–12 weeks (with delays) | 3–15 days |
| Quality Control | Often outsourced | None or fake certs | In-house lab + third-party audits |
| Customization | Limited, expensive | Rarely offered | Full OEM/ODM capability |
| Shipping & Logistics | $80–$150/unit | Unreliable, no tracking | $18–$32/unit, fully tracked |
| Warranty | 30–90 days | None | 24 months |
When you choose HEBEI JIUYUAN, you’re not choosing “cheap.” You’re choosing smart.
Ready to Upgrade Your Flange Supply Chain?
You’ve read the data. You’ve seen the reviews. You know what happens when you delay.
Don’t wait for your next flange to fail.
HEBEI JIUYUAN PIPELINE MANUFACTURING CO.,LTD.
Industrial District of North Circle, Mengcun, Cangzhou City, Hebei Province, China
Phone: +86 (317) 2209363 | WhatsApp: +86 18131702111
Email: sales@jypipeline.com | Website: www.hbjypipeline.com
*All product specifications subject to change. Certifications and compliance documents available upon request. Prices quoted in USD FOB Qingdao. Custom orders require technical drawings. Privacy Policy & Terms of Service available on our website.
